Retail Parking Garage

After cracking and moisture intrusion appeared in a newly constructed parking structure shortly after completion, ZFI Engineering conducted a comprehensive forensic investigation that identified undersized reinforcement, inadequate air entrainment, and active structural cracking. Rather than recommending demolition, ZFI designed an integrated rehabilitation using FRP reinforcement, waterproofing membranes, and targeted column and footing strengthening to restore structural integrity and extend the structure’s service life. Repairs were phased over seven months to keep the adjacent commercial facility operational, limiting deck closures and scheduling major work during nights and weekends. The project demonstrates ZFI’s expertise in forensic engineering, innovative rehabilitation, and delivering durable solutions with minimal operational disruption.

Foundation System:

Footings

Framing System:

Conventionally Reinforced Concrete

Project Location:

Oklahoma City, OK

Client:

Confidential

Contractor / CM:

Coleman Construction

Services:

Expert Witness
Forensic Investigation
Parking Garage Assessments
Parking Garage Rehabilitation
Parking Garage Repair
Peer Reviews
Seismic Evaluations and Assessments
Structural Strengthening and Modifications

Project Type:

Commercial
Parking Garage

Related projects